Czech firm books capacity at Dutch Eemshaven LNG import hub

The Czech Republic, in cooperation with CEZ Group, has booked regasification capacity at Gasunie’s LNG import hub in Eemshaven, which will host two floating storage and regasification units.

“I can confirm that Czech Republic, in cooperation with CEZ Group, has reserved capacity at the Eemshaven LNG terminal,” a Gasunie spokesperson told LNG Prime on Tuesday.

The spokesperson did not reveal additional details.

Combined the two FSRUs will have a capacity of about 8 billion cubic meters per year.

The Czech Republic is a landlocked country in Central Europe, such as its neighbor Slovakia that also secured regasified LNG via European terminals.

We contacted CEZ Group for a comment regarding the capacity booking, but we did not receive a reply by the time this article was published.

Gasunie said in May it had started the tendering procedure for market parties interested in transporting LNG from Eemshaven into the European hinterland.

Also, the company will operate the facility, second Dutch LNG import terminal after Gate, under the name “EemsEnergyTerminal”.

Gasunie said at that time that more than 15 parties had registered their interest in using the terminal to deliver LNG cargoes, and demand was four times higher than supply, as European countries look to reduce reliance on Russian gas supplies.

“We are currently finalizing the various bids,” the spokesperson said.

Both of FSRUs to arrive in August

Belgium’s Exmar and Gasunie signed a five-year charter deal for the 120 meters long FSRU S188 in March.

Following a trip from Singapore, this barge-based FSRU arrived in Rotterdam for modification works at the Damen yard.

In addition, Gasunie also signed a charter deal for a larger FSRU with US LNG player New Fortress Energy. The vessel in question is the 174,000-cbm Golar Igloo.

With a planed expansion at Gate and the Eemshaven project, Dutch capacity would double from current 12 bcm to 24 bcm.

The spokesperson said that Gasunie expects both of the FSRUs to arrive at the Eemshaven facility at the end of August.

“We will be in production before next winter 2022,” the spokesperson added.

Most Popular

Top 5 news of the week July 6-12

LNG Prime brings you the five most popular news stories on our platform during the week of July 6-12, 2026.
spot_img

More News Like This

Eemshaven LNG capacity nearly booked up to 2036

Firms have booked the majority of the regasification capacities at the FSRU-based LNG import facility in the Dutch port of Eemshaven, owned by Gasunie and Vopak, for the period 2028-2036, as part of the planned extension of the terminal's operations beyond 2027.

Nord Gas Solutions bags contract for Exmar FSRU conversion

Nord Gas Solutions, previously known as Wartsila Gas Solutions, has secured a contract from Belgium-based shipping firm Exmar to supply a regasification system for the latter's FSRU conversion which will be installed in the Dutch port of Eemshaven.

Gasunie and Vopak take conditional investment decision on Eemshaven LNG extension

Dutch partners Gasunie and Vopak have taken a conditional investment decision to extend operations of their FSRU-based LNG import facility in the Dutch port of Eemshaven beyond 2027.

Dutch LNG terminals assess demand for ammonia imports

Dutch Gate and Eemshaven LNG terminals, both operated by Gasunie and Vopak, are assessing market demand for renewable and low-carbon gas, including imports of ammonia.